{"id":559,"date":"2022-05-16T12:53:51","date_gmt":"2022-05-16T12:53:51","guid":{"rendered":"http:\/\/duneenergia.com\/?page_id=559"},"modified":"2026-05-17T17:50:07","modified_gmt":"2026-05-17T17:50:07","slug":"comercializacion","status":"publish","type":"page","link":"http:\/\/duneenergia.com\/?page_id=559","title":{"rendered":"Certified Wind Turbine"},"content":{"rendered":"\n<p class=\"has-text-align-center has-luminous-vivid-amber-color has-text-color has-link-color has-medium-font-size wp-elements-63580344273d2cd7a19cf3ad333152c9\"><\/p>\n\n\n\n<p class=\"has-text-align-center has-luminous-vivid-amber-color has-text-color has-link-color has-medium-font-size wp-elements-23023c7199da8ff4e68da8e1b8d9f462\"><strong>Decommissioning Experience<\/strong><\/p>\n\n\n\n<p>Our partner brings extensive international experience in wind turbine decommissioning projects, delivering comprehensive, end-to-end solutions covering all project phases\u2014from planning and permitting to dismantling, transportation, asset recovery, and site restoration.<\/p>\n\n\n\n<p>Their teams consist of highly qualified and certified technicians with proven expertise in complex dismantling and repowering projects across multiple countries, ensuring safe, efficient, and fully compliant execution.<\/p>\n\n\n\n<p>The approach is based on integrated project management, coordinating all resources, equipment, and logistics to optimize timelines and costs while maintaining the highest standards of safety, quality, and environmental protection. <\/p>\n\n\n\n<p>In addition, their capabilities include reuse, recycling, and resale of turbine components, contributing to circular economy models and maximizing residual asset value.<\/p>\n\n\n\n<p>The following section presents some of the key recent projects delivered by our partner<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Salemi \/ Castelvetrano \u2013 Italy<\/h3>\n\n\n\n<p><strong>30 Wind Turbines | 2023\u20132024 | ERG Wind Energy<\/strong><br>Complete decommissioning of the Salemi\/Castelvetrano wind farm (Italy).<br>Works executed under a <em>Dismantling Agreement<\/em> with ERG Power Generation S.p.A., including Ex\u2011Works delivery.<br>Project certified by <strong>ERG Wind Energy S.r.l.<\/strong> (26 Aug 2024).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Germany \u2013 Decommissioning &amp; Recycling (2023)<\/h3>\n\n\n\n<p><strong>57 Enercon E66\u201170 Wind Turbines | Germany<\/strong><br>Decommissioning works including concrete tower demolition, foundation removal and full component recycling.<br>Integrated waste management in compliance with environmental and safety regulations.<br>Project certified by <strong>AS GreenConsult GmbH<\/strong>.<br><br><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Mineo \/ Militello \/ Vizzini \u2013 Italy<\/h3>\n\n\n\n<p><strong>59 Wind Turbines | 2023 | ERG Wind Energy<\/strong><br>Complete decommissioning of the Mineo\/Militello\/Vizzini wind project (Italy).<br>Executed under a <em>Dismantling Agreement<\/em> with ERG Power Generation S.p.A., including Ex\u2011Works delivery.<br>Project completed and certified by <strong>ERG Wind Energy S.r.l.<\/strong> (8 Nov 2023).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"> Camporeale \u2013 Italy<\/h3>\n\n\n\n<p><strong>24 Wind Turbines | 2024 | ERG Wind Energy<\/strong><br>Complete decommissioning of the Camporeale wind farm (Italy).<br>Works carried out in accordance with the contractual Scope of Work defined by ERG.<br>Ex\u2011Works delivery and final certification by <strong>ERG Wind Energy S.r.l.<\/strong> (11 Jan 2024).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Germany \u2013 Decommissioning &amp; Recycling (2024)<\/h3>\n\n\n\n<p><strong>Enercon &amp; Vestas Wind Turbines | Germany<\/strong><br>Full decommissioning of wind turbines including towers, nacelles, blades and concrete foundations.<br>Integrated waste management and recycling in compliance with applicable regulations.<br>Project certified by <strong>AS GreenConsult GmbH<\/strong>.<br><br><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"> Europe \u2013 Decommissioning &amp; Recycling (2024)<\/h3>\n\n\n\n<p><strong>Germany &amp; Austria | GE \u00b7 Enercon \u00b7 Senvion \u00b7 Bonus \u00b7 MD<\/strong><br>Complete decommissioning of wind turbines and concrete foundations across multiple European sites.<br>Responsible transport, waste management and material recycling in line with environmental and safety standards.<br>Project certified by <strong>AS GreenConsult GmbH<\/strong>.<\/p>\n\n\n\n<p><br><br><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Decommissioning Experience Our partner brings extensive international experience in wind turbine decommissioning projects, delivering comprehensive, end-to-end solutions covering all project phases\u2014from planning and permitting to dismantling, transportation, asset recovery, and &#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-559","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/duneenergia.com\/index.php?rest_route=\/wp\/v2\/pages\/559","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/duneenergia.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/duneenergia.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/duneenergia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/duneenergia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=559"}],"version-history":[{"count":105,"href":"http:\/\/duneenergia.com\/index.php?rest_route=\/wp\/v2\/pages\/559\/revisions"}],"predecessor-version":[{"id":1595,"href":"http:\/\/duneenergia.com\/index.php?rest_route=\/wp\/v2\/pages\/559\/revisions\/1595"}],"wp:attachment":[{"href":"http:\/\/duneenergia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}